ASIA POWER WEEK CONFERENCE
Asia Power Week hosts a comprehensive world-class conference programme, with an established legacy. The Asia Power Week Conference consists of 7 tracks, including 4 POWER-GEN Asia Tracks, 2 Renewable Energy World Asia Tracks and the POWER-GEN Asia Financial Forum.
This leading conference is a great opportunity to network with leading organizations and high level influencers at the most prestigious event in the power generation industry.
Tuesday 20 September 2016
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
09:00-10:30
Add to My Itinerary
Room: Grand Ballroom
Format: Presentation
Session Chair
Director of Conferences
PennWell International Power Group
United Kingdom
Keynote Speaker 1
Second Vice Minister
Ministry of Trade, Industry and Energy (MOTIE)
Korea (South)
Keynote Speaker 2
Executive Vice President & CEO, Turbine/Generator
Doosan Heavy Industries & Construction Co., Ltd
Korea (South)
Keynote Speaker 3
CEO Power and Gas Division
Siemens AG
Germany
Keynote Speaker 4
President and CEO
GE Power
United States
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
10:30-11:00
Add to My Itinerary
Room: 2nd Floor Lobby
Track 1 - Trends, Projects & Planning
11:00-12:30
Add to My Itinerary
Room: 212 & 213
Format: Presentation
Separating the myths from the facts when it comes to Asia’s hottest power markets. This session provides the briefing you need before investing in these ...read more...
Session Chair
Thermal Generation Manager, Asia
Jacobs
Malaysia
Presentations:
China's Power Market in Transition: Demand, Fuel Choices and Pricing Reforms
Speaker+
Principal Consultant, China and NE Asia Power
Wood Mackenzie
China
Overview of the Philippines Power Market
Speaker
United States
Overview of the Indonesia Power Market
Speaker
United States
Overview of the Vietnam Power Sector
Speaker+
Senior Director – Commercial and Supply Chain
CLP Holdings Limited
Hong Kong
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
12:30-14:00
Add to My Itinerary
Room: Delegate Restaurant, Exhibition Floor
Track 1 - Trends, Projects & Planning
14:00-15:30
Session 2: Power Market Snapshots & Panel Discussion
Add to My Itinerary
Room: 212 & 213
Format: Panel Discussion
Four short presentations set the scene on a panel debate unpacking electricity sector trends and key developments in China and North ...read more...
Session Chair
Asia Energy, Infrastructure Research Head, Bloomberg Intelligence
Bloomberg LP
Hong Kong
Presentations:
New Power Markets in Asia - Liberalization Trials & Opportunities
Speaker+
Asia Energy, Infrastructure Research Head, Bloomberg Intelligence
Bloomberg LP
Hong Kong
Recent Reform Initiatives in China’s Power Sector and Implications Analyses
Speaker+
Principal Consultant
DNV GL
Singapore
How will Power Sector Liberalization Change the Face of Japan’s Fuel Mix and Corporate Landscape?
Speaker+
Principal Power Analyst
Wood Mackenzie
Singapore
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
15:30-16:00
Add to My Itinerary
Room: 2nd Floor Lobby
Track 1 - Trends, Projects & Planning
16:00-17:30
Session 3: Risks & Disruptions
Add to My Itinerary
Room: 212 & 213
Format: Presentation
Power projects face many risks and threats that have to be managed as well as disruptive technologies that can move the goalposts, all of which will be explained this must-attend ...read more...
Session Chair
Managing Partner - Power Asia Pacific
Environmental Resources Management
Hong Kong
Presentations:
Developing a Sustainable Cyber Security Policy for Power Plants
Speaker+
Asia Area Product Sales Manager
ABB Pte Ltd.
Singapore
Weather Risks and Solutions for Power Projects
Speaker
Managing Director
Aon Benfield
United Kingdom
Smart Benefits vs Dumb Benefits: Disrupting the Disrupters
Speaker+
Partner
The Lantau Group (HK) Limited
Hong Kong
Legal Strategies for Addressing Risks and Pitfalls
Speaker+
Partner
Nabarro LLP
Singapore
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
10:30-11:00
Add to My Itinerary
Room: 2nd Floor Lobby
Track 2 - Optimizing Plant Operation
11:00-12:30
Session 1: Asset and O&M Strategies
Add to My Itinerary
Room: 211
Format: Presentation
This session highlights the differing approaches taken to deal with the challenges presented by ever changing and different power markets within the Asia region. New ideas and trends captured by the presenters can be conveyed to the attendees through this ...read more...
Session Chair
Technical Advisor
SK E&S
Korea (South)
Presentations:
TNB Generation Operational & Maintenance Transformation
Speaker+
GM (Generation Transformation)
Tenaga Nasional Berhad
Malaysia
Risk-Based Maintenance Management on CFBC Boiler
Speaker+
Principal Researcher
Korea Electric Power Corporation (KEPCO) Research Institute
Korea (South)
Co-Author
Researcher
KEPCO Research Institute
Korea (South)
Speaker+
O&M Manager
SK E&S
Korea (South)
Reduction of PM 2.5 Micro Dust and CO2 Emission by Coal Plant into Hybrid Power Plant
Speaker+
APAC Power Service Marketing Leader
GE Power Service
Korea (South)
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
12:30-14:00
Add to My Itinerary
Room: Delegate Restaurant, Exhibition Floor
Track 2 - Optimizing Plant Operation
14:00-15:30
Session 2: Modernization & Life Extension
Add to My Itinerary
Room: 211
Format: Presentation
This session introduces the improvement of plant life & degradation by means of upgraded control system, CFD simulation and so ...read more...
Session Chair
Technical Adviser
IHI Power System MaIalaysia Sdn Bhd
Malaysia
Presentations:
Monitoring & Diagnostics to Know the Pulse of the Plant Health
Speaker+
Technical Head & PM
Black & Veatch
India
Co-Author
Engineer
Black & Veatch
United States
Save Millions in Downtime, Hardware and Headaches: Keep the Control
Speaker+
Chief Engineer
Gas Turbine Controls Corporation
United States
Co-Author
VP-Asia
Gas Turbine Controls Corporation
Singapore
Co-Author
Services Manager
Gas Turbine Controls Corporation
United States
Root Cause Failure Analysis of Superheater Tubes Using Computational Fluid Dynamics Simulations
Speaker
Chief Engineer
Tetra Engineering Group, Inc
United States
Co-Author+
Mechanical Engineer
Tetra Engineering Europe
France
Co-Author
Consultant
R&R Consult
Denmark
CC Plants HRSG – Realistic Performance Monitoring for Performance Degradation
Speaker
Chief Thermal Engineer
Vogt Power International
United States
Co-Author+
Technical Director
Vogt Power International
United States
Track 1 - Trends, Projects & Planning
Track 2 - Optimizing Plant Operation
Track 3 - Power Plant Technologies
Track 4 - Grid Integration & Distributed Power
15:30-16:00
Add to My Itinerary
Room: 2nd Floor Lobby
Track 2 - Optimizing Plant Operation
16:00-17:30
Add to My Itinerary
Room: 211
Format: Presentation
Session looking at some interesting recent gas turbine and steam turbine upgrade experiences or services resulting in performance ...read more...
Session Chair
Engineering Manager
Mitsubishi Hitachi Power Systems, Ltd
Japan
Presentations:
20% More Power & 5% More Gas Turbine Efficiency on Model 7FA
Speaker+
President & CEO
PowerPHASE LLC
United States
Performance Improvement by Utilizing New Gas Turbine Technology
Speaker+
Deputy General Manager
Korea District Heating Corporation
Korea (South)
![]() | Technical Tour 1: |
POSCO Incheon Combined Cycle Power Plant Unit 7/8/9
POSCO 7,8,9 is one of the most successful CCPP projects executed in Korea by POSCO Energy, POSCO E&C and Siemens. The power plant is located in Incheon, approximately 35 km south from Seoul, and nearby an industrial complex and the free economic zone. The power plant is based on 3 single shaft combined cycle blocks of H-class design with 3 pressure reheat water-steam cycle producing 1260 MW with over 60% net efficiency. All 3 blocks entered commercial operation on Aug. and Nov. 2014 and Feb. 2015.
Ranked highest in the Korean SMP (system marginal price) system for combined cycles, it has provided electricity to more than 2.9 million people since 2014. Incheon is one of the metropolitan cities in Korea around Seoul and a centralized transportation and industrial complex. In transportation, Incheon has two major transportation hubs including the international airport of Seoul and a large harbor. Incheon international airport is one of the biggest hub airports in East Asia and the harbor is the main transport hub between Korea and China. The industrial complex is mainly comprised of small manufacturing enterprises.
POSCO 7,8,9 is known for being of the first projects in Asia based on adopting H-class technology and for leading the dispatching regime for CCPPs in Korea due to lowest operational costs-based on the Korean SMP market. POSCO Energy is one of the biggest IPPs in Korea and their newest blocks 7,8,9 added to the Incheon complex had to be competitive in their lifetime cycle for which the Siemens SGT6-8000H engines were selected.. Blocks 1-6 at the Incheon plant are older CCPP blocks featuring Siemens D and Fclass technology Blocks 7,8,9 with their high inlet temperature technology and SCR systems achieve highest efficiencies beyond 60% but still keeping low emissions for NOx and CO. The HRSGs are based on Benson once-through technology to achieve short start-up times and highest operational flexibility for cycling operational duties and efficient part load operation.
HOW TO REGISTER FOR TECHNICAL TOUR 1
TO REGISTER FOR THIS TECHNICAL TOUR PLEASE VISIT OUR "HOW TO REGISTER" PAGE AND SIGN-UP BEFORE 19 AUGUST 2016
Please Note:
No onsite registration will be available
All attendees must have registered and paid for the tour before Friday 19 August
All attendees will have to provide the required additional information by Friday 26 August (a form will be sent to you following your registration)
Attendees are requested to wear sensible clothing (miniskirts or shorts not permitted) and no open shoes
![]() | Technical Tour 2: |
Yeonghueng Thermal Power Station
Yeongheung Thermal Power Station, of which Unit 1 started COD in July 2004 and Unit 6 started COD in November 2014, has six units in operation with combined capacity of 5,080 MW. Supplying approximately 25% of electricity consumption in the Seoul Metropolitan Area, it is Korea’s largest thermal power site as well as a sole coal fired power site located in the Seoul Metropolitan Area. The power station has produced a large amount of electricity at a reasonable cost of 60% less than a LNG fired plant, contributing remarkably to keeping electric bills affordable. In this regard, it takes a significant part in executing a national energy policy.
With advanced environmental equipment in operation, Yeongheung Thermal Power Station strives to protect the environment. Its Flue-gas Desulfurization(FGD) can remove 98.9% of sulfur oxides(SOx) in the flue gases and reducing SOx level to 14 ppm which is lower than 25 ppm of allowable emission limit. In addition, Selective Catalytic Reduction(SCR) of Yeongheung Power Station, an advanced emissions control technology, enables to reduce nitrogen oxides(NOx) to below 12 ppm which is lower than 15 ppm of emission limit. Also, Yeonghueng’s Electrostatic Precipitator(EP) removes more than 99.9% of dust particles, keeping the emission concentration below 1 mg/m3 which is lower than 5 mg/ m3 of allowable emission limit.
While expanding employment and social contribution activities to develop local economy and improve the quality of life of local residents, Yeongheung Power Station operates new & renewable energy facilities to lead low carbon and green growth. A wind power complex with a capacity of 46 MW has been constructed using home-grown technologies at Yeonghueng power station. The complex will serve as a stepping stone for exporting Korean wind power generators in the future. And a marine small hydro power is being operated in at Yeongheung Power Station by using the hydro energy of the gravity water flow from the coal-fired thermal power plant units. Yeongheung Power Station also operates the photovoltaic power plant with a capacity of 2 MWp.
HOW TO REGISTER FOR TECHNICAL TOUR 2
TO REGISTER FOR THIS TECHNICAL TOUR PLEASE VISIT OUR "HOW TO REGISTER" PAGE AND SIGN-UP BEFORE 19 AUGUST 2016
Please Note:
No onsite registration will be available
All attendees must have registered and paid for the tour before Friday 19 August
All attendees will have to provide the required additional information by Friday 26 August (a form will be sent to you following your registration)
Attendees are requested to wear sensible clothing and no open shoes
中展世貿(北京)國際會展有限公司
Tel:+86-10-65924277、65920071、57729779
Fax:+86-10-52283937
E-mail:expo@world-fairs.org
Add:北京市朝陽區南三里屯白家莊路甲3號白家莊商務中心C座2層
廈門分辦事處:
Tel:+86-592-3133736、3133870、3133818
Add:福建省廈門市湖里區高新技術園安嶺二路89號金鳳大廈8013室
China Exhibition World Co.,Ltd
Tel:+86-10-65924277、65920071、57729779
Fax:+86-10-52283937